on going boiler Agent construction project in ap

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :on going boiler Agent construction project in ap
  • Supply Capacity : 10 units/month :on going boiler Agent construction project in ap
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

About us Fangkuai has more than 20 years of experience in R&D and manufacturing of green energy-saving boiler equipment, and is committed to designing and producing boilers that meet customer needs.
Contact us

Global Sales Hotline

telephone:
0086-55929010

Email: [email protected]

Voicemail
  • Commissioning Condensing Boilers - PCD Engineering

    There is an independent building commissioning agent appointed for the building project. The head contractor of the building construction is ISO 14001 accredited and followed an extensive environmental management plan. Within the construction process, 60% ofGet Price

  • Online Application Form Project Registration (Individual)

    The first step in the preparation of performance budget, O&M is formulation of maintenance and overhauling schedules for boiler and TO with generation, then considering the grid demand, the availability or inputs and factory problems, if any the utilization ofGet Price

  • Search project for construction - Find project for construction

    • Boiler combustion adjusted for altitude. • Boiler vented independently. • Low-water cutoff installed at least 6 in. above boiler. • Boiler air vent installed. • System filled, and, if required, proper percentage of glycol installed. • Pressure and temperature plugsGet Price